Mill Computing, Inc. Forums The Mill Architecture The Belt Reply To: The Belt

Ivan Godard
Keymaster
Post count: 689

The specializer doesn’t know where the spiller puts things, because it cannot predict the dynamic control flow and hence the belt demand. As soon as there is a trap/interrupt or the main program goes through a function or label pointer, or even a conditional branch, well, that’s all she wrote.